Tara Habibi, Project Manager, Capital Design and Construction provided the Subcommittee with an update on the renovations to have been completed at Kinsmen Hall on the exterior which included an accessible ramp replacement, stair widening on the east elevation and a flat path to and from the emergency exit.
Ms. Habibi presented the Phase 2 accessible renovations that would include an accessible kitchen and washrooms and advised members that modifications were limited because the building is a heritage building.
Subcommittee members inquired about hand rails in the washroom, signage, counter heights, an accessible sink in the kitchen and use of colour contrast.